Verizon closeout checklist

Crown Envelope Adj Pre Pictures

The photos a crew has to come back with on a Crown Envelope Adj Pre Pictures scope, organized by section, with the note that tells them what to capture.

Sections
4
Photo requirements
22
Carrier
Verizon

Ground Pre Pics

  1. 1

    Access Road

  2. 2

    Compound Signage

  3. 3

    Overall Compound existing Conditions

    All sides and corners

  4. 4

    Safety Climb Bottom Assembly

  5. 5

    Safety Climb Looking Up

  6. 6

    Sector Overview from ground

    Alpha - Beta - Gamma -Zoom In & Out

  7. 7

    Monopole Interior

  8. 8

    Guywire Anchor Overview

    All 3 Anchor Enclosers

Tower Pre Pics

  1. 1

    Alpha Sector Top Overview

  2. 2

    Alpha Sector Bottom Overview

  3. 3

    Beta Sector Top Overview

  4. 4

    Beta Sector Bottom Overview

  5. 5

    Gamma Sector Top Overview

  6. 6

    Gamma Sector Bottom Overview

  7. 7

    Safety Climb Top Assembly

    Zoom in if not Top 10ft

  8. 8

    Safety Climb Overview

    Existing Condition and Support at Mount Height

  9. 9

    Other Top Conditions

PRE Envelope Measurements (Pipe Only)

  1. 1

    Alpha Pipe Length PRE Adjustment

    Length of Pipe if Adjustment is needed (tape measurement)

  2. 2

    Beta Pipe Length PRE Adjustment

    Length of Pipe if Adjustment is needed (tape measurement)

  3. 3

    Gamma Pipe Length PRE Adjustment

    Length of Pipe if Adjustment is needed (tape measurement)

Pre Envelope Measurement - Laser

  1. 1

    Highest Appurtenance

    Laser Measurement to Top of Equipment or Steel (One Sector only If All the same)

  2. 2

    Lowest Appurtenance

    Laser Measurement to Bottom of Equipment, Steel or Jumper Drip Loop (One Sector only If All the same)

Run this on a real job

In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.