Verizon closeout checklist
Crown Envelope Adj Pre Pictures
The photos a crew has to come back with on a Crown Envelope Adj Pre Pictures scope, organized by section, with the note that tells them what to capture.
- Sections
- 4
- Photo requirements
- 22
- Carrier
- Verizon
Ground Pre Pics
- 1
Access Road
- 2
Compound Signage
- 3
Overall Compound existing Conditions
All sides and corners
- 4
Safety Climb Bottom Assembly
- 5
Safety Climb Looking Up
- 6
Sector Overview from ground
Alpha - Beta - Gamma -Zoom In & Out
- 7
Monopole Interior
- 8
Guywire Anchor Overview
All 3 Anchor Enclosers
Tower Pre Pics
- 1
Alpha Sector Top Overview
- 2
Alpha Sector Bottom Overview
- 3
Beta Sector Top Overview
- 4
Beta Sector Bottom Overview
- 5
Gamma Sector Top Overview
- 6
Gamma Sector Bottom Overview
- 7
Safety Climb Top Assembly
Zoom in if not Top 10ft
- 8
Safety Climb Overview
Existing Condition and Support at Mount Height
- 9
Other Top Conditions
PRE Envelope Measurements (Pipe Only)
- 1
Alpha Pipe Length PRE Adjustment
Length of Pipe if Adjustment is needed (tape measurement)
- 2
Beta Pipe Length PRE Adjustment
Length of Pipe if Adjustment is needed (tape measurement)
- 3
Gamma Pipe Length PRE Adjustment
Length of Pipe if Adjustment is needed (tape measurement)
Pre Envelope Measurement - Laser
- 1
Highest Appurtenance
Laser Measurement to Top of Equipment or Steel (One Sector only If All the same)
- 2
Lowest Appurtenance
Laser Measurement to Bottom of Equipment, Steel or Jumper Drip Loop (One Sector only If All the same)
Run this on a real job
In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.