Verizon closeout checklist
Pre Pictures - Azimuth Adj
The photos a crew has to come back with on a Pre Pictures - Azimuth Adj scope, organized by section, with the note that tells them what to capture.
- Sections
- 2
- Photo requirements
- 15
- Carrier
- Verizon
Ground Pre Pics
- 1
Access Road
- 2
Compound Signage
- 3
Overall Compound existing Conditions
All sides and corners
- 4
Ice Bridge
- 5
Safety Climb Bottom Assembly
- 6
Safety Climb Looking Up
- 7
Sector Overview from ground
Alpha - Beta - Gamma -Zoom In & Out
- 8
Monopole Interior
- 9
Guywire Anchor Overview
All 3 Anchor Enclosers
Tower Pre Pics
- 1
Alpha Sector Top Overview
Capture All Equipment & Any Existing Steel MOD
- 2
Beta Sector Top Overview
Capture All Equipment & Any Existing Steel MOD
- 3
Gamma Sector Top Overview
Capture All Equipment & Any Existing Steel MOD
- 4
Other Top Conditions
- 5
Safety Climb Top Assembly
Zoom in if not Top 10ft
- 6
Safety Climb Overview
Existing Condition and Support at Mount Height
Run this on a real job
In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.