Verizon closeout checklist

Plumb & Down Tilt - CBRS

The photos a crew has to come back with on a Plumb & Down Tilt - CBRS scope, organized by section, with the note that tells them what to capture.

Sections
12
Photo requirements
24
Carrier
Verizon

Alpha 2 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Alpha 3 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Alpha 4 - C Band

  1. 1

    PL

  2. 2

    DT

Alpha 4 - CBRS

  1. 1

    PL

  2. 2

    DT

Beta 2 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Beta 3 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Beta 4 - C Band

  1. 1

    PL

  2. 2

    DT

Beta 4 - CBRS

  1. 1

    PL

  2. 2

    DT

Gamma 2 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Gamma 3 - 700/850/AWS/PCS

  1. 1

    PL

  2. 2

    DT

Gamma 4 - C Band

  1. 1

    PL

  2. 2

    DT

Gamma 4 - CBRS

  1. 1

    PL

  2. 2

    DT

Run this on a real job

In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.