Verizon closeout checklist

Mount MOD w Diagonal Brace

The photos a crew has to come back with on a Mount MOD w Diagonal Brace scope, organized by section, with the note that tells them what to capture.

Sections
5
Photo requirements
17
Carrier
Verizon

Diagonal Brace Pipes

  1. 1

    Alpha Left Brace Overview

  2. 2

    Alpha Right Brace Overview

  3. 3

    Beta Left Brace Overview

  4. 4

    Beta Right Brace Overview

  5. 5

    Gamma Left Brace Overview

  6. 6

    Gamma Right Brace Overview

Vertical Pipes

  1. 1

    Alpha # 1 & 4 Vert. Pipe Top Distance

    All Installed Pipes

  2. 2

    Beta # 1 & 4 Vert. Pipe Top Distance

    All Installed Pipes

  3. 3

    Gamma # 1 & 4 Vert. Pipe Top Distance

    All Installed Pipes

OVP Pipe Install

  1. 1

    OVP Pipe Overview

    Clear Pics showing pipe ACAP to Brace & New MSK1 Plates

Other Pictures

  1. 1

    Other Pictures

Tie Back Install

  1. 1

    Alpha Tie Back Bracket Distance

    Distance from Specified Location at Horizontal Face

  2. 2

    Alpha Excess Length

    Length of excess Pipe at Tower Leg Bracket

  3. 3

    Beta Tie Back Bracket Distance

    Distance from Specified Location at Horizontal Face

  4. 4

    Beta Excess Length

    Length of excess Pipe at Tower Leg Bracket

  5. 5

    Gamma Tie Back Bracket Distance

    Distance from Specified Location at Horizontal Face

  6. 6

    Gamma Excess Length

    Length of excess Pipe at Tower Leg Bracket

Run this on a real job

In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.