Verizon closeout checklist
Mount MOD w Diagonal Brace
The photos a crew has to come back with on a Mount MOD w Diagonal Brace scope, organized by section, with the note that tells them what to capture.
- Sections
- 5
- Photo requirements
- 17
- Carrier
- Verizon
Diagonal Brace Pipes
- 1
Alpha Left Brace Overview
- 2
Alpha Right Brace Overview
- 3
Beta Left Brace Overview
- 4
Beta Right Brace Overview
- 5
Gamma Left Brace Overview
- 6
Gamma Right Brace Overview
Vertical Pipes
- 1
Alpha # 1 & 4 Vert. Pipe Top Distance
All Installed Pipes
- 2
Beta # 1 & 4 Vert. Pipe Top Distance
All Installed Pipes
- 3
Gamma # 1 & 4 Vert. Pipe Top Distance
All Installed Pipes
OVP Pipe Install
- 1
OVP Pipe Overview
Clear Pics showing pipe ACAP to Brace & New MSK1 Plates
Other Pictures
- 1
Other Pictures
Tie Back Install
- 1
Alpha Tie Back Bracket Distance
Distance from Specified Location at Horizontal Face
- 2
Alpha Excess Length
Length of excess Pipe at Tower Leg Bracket
- 3
Beta Tie Back Bracket Distance
Distance from Specified Location at Horizontal Face
- 4
Beta Excess Length
Length of excess Pipe at Tower Leg Bracket
- 5
Gamma Tie Back Bracket Distance
Distance from Specified Location at Horizontal Face
- 6
Gamma Excess Length
Length of excess Pipe at Tower Leg Bracket
Run this on a real job
In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.