Verizon closeout checklist

Height Measurements - C Band+Air3283

The photos a crew has to come back with on a Height Measurements - C Band+Air3283 scope, organized by section, with the note that tells them what to capture.

Sections
11
Photo requirements
28
Carrier
Verizon

Alpha 3 - 700/850/AWS/PCS

  1. 1

    Tip

  2. 2

    Center Line

Alpha 4 - C Band

  1. 1

    Tip

  2. 2

    Center Line

Alpha AIR 3283

  1. 1

    Tip

  2. 2

    Center Line

Beta 3 - 700/850/AWS/PCS

  1. 1

    Tip

  2. 2

    Center Line

Beta 4 - C Band

  1. 1

    Tip

  2. 2

    Center Line

Beta AIR 3283

  1. 1

    Tip

  2. 2

    Center Line

Gamma 3 - 700/850/AWS/PCS

  1. 1

    Tip

  2. 2

    Center Line

Gamma 4 - C Band

  1. 1

    Tip

  2. 2

    Center Line

Gamma AIR 3283

  1. 1

    Tip

  2. 2

    Center Line

Structure Height

  1. 1

    Tower Top

    Height of Structure

  2. 2

    Lightning Rod

    Measurement from Top of Structure to End of Rod

  3. 3

    Beacon Height

    Measurement from Bottom of Beacon to the Ground

  4. 4

    Highest Appurtenance

    Measurement from Top of Structure to Highest Object (Pipe, Antenna or Beacon)

PMI - Vertical Envelope

  1. 1

    Tip of Highest Appurtenance

    Tip of Antenna, Pipe or Steel Mod

  2. 2

    Alpha Tip of Lowest Appurtenance

    Bottom of Antenna JUMPERS, Pipe or Steel Mod

  3. 3

    Beta Tip of Highest Appurtenance

    Tip of Antenna, Pipe or Steel Mod

  4. 4

    Beta Tip of Lowest Appurtenance

    Bottom of Antenna JUMPERS, Pipe or Steel Mod

  5. 5

    Gamma Tip of Highest Appurtenance

    Tip of Antenna, Pipe or Steel Mod

  6. 6

    Gamma Tip of Lowest Appurtenance

    Bottom of Antenna JUMPERS, Pipe or Steel Mod

Run this on a real job

In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.