Verizon closeout checklist
CRANE Use
The photos a crew has to come back with on a CRANE Use scope, organized by section, with the note that tells them what to capture.
- Sections
- 3
- Photo requirements
- 3
- Carrier
- Verizon
Day # 1
- 1
Crane Use Picture
Time/Date/Location Stamped Pictures showing Crane Being Used ! Capture Crane and Tower Also!
Day # 2
- 1
Crane Use Picture
Time/Date/Location Stamped Pictures showing Crane Being Used ! Capture Crane and Tower Also!
Day # 3
- 1
Crane Use Picture
Time/Date/Location Stamped Pictures showing Crane Being Used ! Capture Crane and Tower Also!
Run this on a real job
In Mastlens this checklist becomes a live job: the crew shoots each photo against its field on a phone, GPS- and time-stamped, offline if the site has no signal, and the finished closeout package builds itself.